Products

Short Lead Time for Radiator Hose Repair Tape - fix tape – ASN

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

We have now probably the most innovative production equipment, experienced and qualified engineers and workers, regarded high quality control systems and also a friendly expert income team pre/after-sales support for Waterproof Construction Tape, Thoracolumbar Brace For Scoliosis, Waterproof Pipe Repair Tape, Welcome friends from all over the world come to visit, guide and negotiate.
Short Lead Time for Radiator Hose Repair Tape - fix tape – ASN Detail:

Features:

 • Catalyst: Water

 • Resin Makeup: Polyurethane

 • Heat Resistance: 180°C

 • Pressure: 2175 PSI

 • Bonds: Copper pipe, PVC, polypipe, metal, fibreglass

 • Set Time: 20– 30 minutes, sets under water

 • Chemical resistance: Most diluted chemicals and fuels

 1.Resists cold and hot temperatures

 2.Easy to apply, no mixing or messy clean up

 3.Resistan to water, acid, salts, or soil organics

 4.Can be applied underwater or to wet surfaces

 5.Quick, long term protective coating, ready for immediate service

 6.Non-toxic and acceptable for portable water lines

20

Technical Data

 ♦ Useable life: 2-3 minutes, depending on temperature of water and pipework

  ♦ Intial cure time: 5 minutes

  ♦ Full cure time: 30minutes

  ♦ Shore D hardness: 70

  ♦ Tensile strength: 30-35Mpa

  ♦ Tensile modulus: 7.5Gpa

  ♦ Maximum service temperature: 180° C

  ♦ Pressure resistance:400 psi (Min wrapping 15 layers around cracked/leaking area)

Application

1. Once the leaking area is identified, shut down relevant pipes or hoses immediately.  Prepare the surface by cle aning and roughening the pipe.

2.Put on enclosed latex gloves. Apply Steel Putty to the leak site and mould. 

3.Open foil pouch and immerse bandage in temperate fresh water for 5~10 seconds.The entire contents must be used once the package is opened. 

4.  Apply around the damaged area extending up to 50mm either side of the leak to ensure complete coverage.

5. As curing begins once it is taken out of the water. Whilst wrapping, pull each layer tightly by using your hand to mould and squeeze the layers 

together. Continue this action during and upon completion. 

Packing & Shipping

Packing:        Carton packaging

Delivry time:  within 3 weeks from order confirmation date

Shipping:       By sea/air/express


Product detail pictures:

Short Lead Time for Radiator Hose Repair Tape - fix tape – ASN detail pictures


Related Product Guide:

Each individual member from our large performance revenue crew values customers' needs and company communication for Short Lead Time for Radiator Hose Repair Tape - fix tape – ASN , The product will supply to all over the world, such as: European, UAE, Suriname, The president and all the company members would like to provide professional products and services for customers and sincerely welcome and cooperate with all native and foreign customers for a bright future.
  • This is a very professional and honest Chinese supplier, from now on we fell in love with the Chinese manufacturing.
    5 Stars By Victor from Hanover - 2018.06.30 17:29
    We feel easy to cooperate with this company, the supplier is very responsible, thanks.There will be more in-depth cooperation.
    5 Stars By Honorio from European - 2018.06.18 19:26
    Write your message here and send it to us